Most cargo claims need the same handful of letters, whichever side you are on: a demand to the carrier, a reminder when nothing comes back, a time bar extension before the limitation date, and in the end a settlement agreement. Every case in CaseSuma now has a standard set of them, and a new Settlement tab keeps track of the offers that lead to an agreement.
Six standard letters in every case
The Templates card of a case lists them:
- Letter of Demand
- Final Notice
- Notice of Loss
- Claim Receipt / Rejection of Liability
- Time Bar Extension
- Settlement Agreement
Pick one and it fills itself in from the case: the addressee, the parties, the claim amount and currency, today’s date and a payment deadline, your client’s bank details, and on a cargo claim the transport document number and date, the cargo, the consignee and the surveyor. You type only what the case does not know, such as the applicable law or the interest rate, and tick the paragraphs you need. The letter is shown next to the fields and changes as you type.
Edit it, then save it into the case
Before you save, you can edit the letter itself, in one of 10 fonts and sizes from 8 to 20 pt, with or without your letterhead. Save as PDF or Save as Word puts the letter straight into the case’s Documents, adds a line to the case History and downloads a copy for you.
On the Teams plan, your own templates sit next to the standard ones on the case, under Custom, fill in from the case too, and save the same way.
The letters are a starting point, not legal advice: read each one before you send it.
The Settlement tab
Settlement talks often run over weeks of e-mails. The Settlement tab of a case keeps every offer and counter-offer in one list: the date, who made it (your side, the other side or the insurer), the amount and currency, its status (open, rejected, accepted or withdrawn), a note, and the document it came with, picked from the case’s Documents.
At the top you see the claim amount, the latest offer, the gap between the two when they are in the same currency, and the agreed amount once an offer is accepted. Every offer added, changed or deleted is written to the case History.
When an offer is accepted, the Settlement Agreement takes the agreed amount from the tab. It can set out one payment or up to 12 instalments, and it can add a schedule of the offers exchanged.
Try it
Both are in every case now. Start your free trial, or tell us what you think on our contact page.



